The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
Roofing tar paper overlap.
Even if there s older tar paper in place you should simply rip it off and replace it.
Once you get close to the top add another layer of felt so that you overlap the ridge of your roof by about 1 foot 0 30 m.
Step 5 secure ends.
Make at least three layers.
This overhang will ensure water will not enter underneath the paper getting trapped on top of the wood roof planks.
Experienced professionals never allow the hot tar to clump up or build up in any area.
Make sure the rolls overlap by at least four inches and staple them into place on the wood.
Step 4 over the peak.
Position the next course of tar paper farther up the roof so that its lower edge overlaps the upper edge of the paper in the first course by 1 foot.
It is used for temporary roofing for weatherproofing and as an underlayment under shingles or other permanent roofing materials.
Roll the roof paper up and over the peak.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
This will help give you a moisture barrier on the roof.
Roof felt also known as tar paper is a waterproof fiberglass product.
As long as the wood on your roof is in good condition you can go ahead and put tar paper down.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
Once the tar is applied tar paper can be carefully placed on top of the hot tar using a mop to sink the paper into the asphalt.
The roofing felt should be applied in layers that overlap.
Step 6 overlap next roll.
Continue overlapping strips up each side of the roof.
As you work the paper can be tacked down in the center so it won t blow away.
Overlapping the tar paper layers to create a seal.
Tack it firmly in place.
Climb onto the roof and lay a second strip of tar paper above the first strip overlapping it by about 5 inches.
Roofing felt is required to overlap 2 inches over the lower felt course.
Staple down the tar paper.
Before applying roofing you ll need to cover the sheathing with roofing felt also often called tar paper most local codes call for using 30 pound felt.